News

Authorization
10.05.2011

V 164-7,0 MW turbine launched

Lowering the cost of energy in relation to offshore wind is essential for the industry. Some of the major stepping stones in achieving this are size and subsequent energy capture, which means a need for much bigger turbines that are specifically designed for the challenging offshore environment. With the introduction of the V164-7,0 MW specifically designed for the roughest North Sea conditions, Vestas is taking a major step towards meeting these needs.

Source: Vestas